Monday, July 18, 2016

Overdue update for Tori and Matt's house!

6 weeks have gone by since I have given an update on Tori and Matt's house.  Don't think for a minute that means work hasn't been happening.  We are still over there most weekend and some week nights.  These last few weeks we owe all our thanks to my Mom and Dad, and Bobbie and Scott!!!! I'm really anxious to show the before and after pictures, but I think I need to wait until rooms are 100% complete... so I will only show progress pictures.

So here are the updates on 3 of the rooms:

Kitchen - Tile is on the floor and grouted, granite counter tops installed, all new appliances, cabinets have been painted and hung, windows have been trimmed out, and new (old) 80 year old table has been bought! (remaining work includes the trim along the top of the cabinets, back splash, and window treatments)



Bathroom - Plumbing has been completed, floor and shower tile have been installed.  Closet has been reconfigured in order to allow for central heat and air to be installed upstairs.


2nd bedroom:This room is the closest to being complete!  Just a little more trim paint and a little more work on some furniture.  The walls are painted, the trim is all down, 90% painted, nail holes filled in, and touch up paint done.  Antique bed, rocking chair, and dressing table (that she bought from the previous owners) has been painted.  (the picture was taken before the mirror was on the dressing table)




No comments: