Sunday, May 1, 2016

Electrical, Plumbing, Framing, Sub Floor


With the drywall about to start, it meant a huge rush to get everything done.  At some point I will make a post and really take the time to think everyone that has helped out.  This push included Mike hanging lights and running wire, My Dad working every single day crawling in the crawlspace to run new electrical.  Rod running plumbing, Rod and Matt both working on framing, and Rod and his Dad replacing sub floor. That is two in the over 60 category working hard!

Too much work was going on for good pictures... but here is one picture I got of Mark.